Tag Archives: tea party

Closing Japan nuke plant will have direct affect on British nuke plant

The closing of Hamaoka nuclear plant in Japan, because of the danger of a massive earthquake, is having direct affect on a British nuclear plant.

Sellafield MOX plant, in north west England, supplies Hamaoka with the nuclear fuel it needs to make electricity.  Hamaoka uses MOX (mixed oxide) nuclear fuel, and Chubu Electric Power Company (operator of Hamaoka) has a contract with Sellafield as its only supplier.

On top of that the Hamaoka plant is the only user of MOX fuel from Sellafield.

Taxpayers in the United Kingdom shelled out 1.34 billion Pounds (U.S. $2.1 billion) for the Sellafield MOX plant, and the British government wants to build another one.

British officials are scrambling to work with CEPCo officials to figure out how to fulfill their contract.  Maybe the Brits can start selling MOX to the Iranians?

Radioactive fallout map of Japan released

The U.S. Department of Energy, and the Japanese Science Ministry, have put together a map of the fallout pattern of cesium.  The damaged Fukushima Daiichi nuclear plant has been spewing cesium.

The map shows the cesium fallout extends north west of the plant, in a large area. It is depicted with the colors yellow and red. NHK has a report.

Official say radiation levels from the Fukushima Daiichi plant have dropped enough that it is time to conduct more testing of soil for levels, and types, of radiation contamination.

 

Another nuke plant in Japan leaking radiation

Japan Atomic Power Company said its Tsuruga nuclear plant leaked a small amount of radiation on Sunday, 08 May 2011.  But this is not the first time.

On 02 May radiation was detected outside the reactors.  JAPCo officials think the radiation leak is coming from the cooling water for the fuel rods. They are shutting down the plant to inspect.

Tsuruga nuke plant is in Fukui Prefecture, directly west of Tokyo.

More Strontium detected at Fukushima Daiichi! Government may start checking surrounding areas

Radioactive strontium continues to be spewed from the damaged Fukushima Daiichi nuclear plant.  Soil samples taken at the plant, on 18 April, tested positive for strontium 89 and strontium 90.

Strontium collects in your bones and can cause various bone cancers.  You get contaminated by breathing it.

Tokyo Electric Power Company says April’s strontium 90 levels are 130 times higher than the levels detected in March!  The levels of strontium 89 are 4,400 becquerels per kilogram of soil!

Because of the increase in strontium levels, officials in the Japanese government are advising that readings need to be taken in areas outside the Fukushima Daiichi plant. Once again, you’d think  they’d already be doing that.

 

Chubu Electric decides to shut down nuke plant, Japanese auto & electronics industries will be hit

After first saying no, CEPCo now says OK they will shut down their Hamaoka plant.

Prime Minister Naoto Kan asked Chubu Electric Power Company to shut down their Hamaoka nuke plant, because the plant sits on top of a convergence of fault lines, that could produce an 8+ quake.  The plant is not built to withstand such a quake, and the Japanese government wants the plant operators to reinforce the reactors.

The problem for CEPCo is that they have no way to replace the electric power that will be lost when they shut down the reactors.  The Japanese auto industry, and other manufacturers, are worried because they are already dealing with supply problems due to lack of electricity.  The shut down of Hamaoka nuclear plant will only make the supply situation worse.

CEPCo officials say that, so far, they can not come up with any practical alternative to replace the lost electrical power.

Toyota, Honda, Mitsubishi and Suzuki have factories in the prefectures that will be affected by the nuke plant shut down.  Also, electronics makers Panasonic, Toshiba and Fujitsu have factories that will be affected by the shut down.

Chubu Electric refuses Prime Minister’s request to shut down nuke plant, for now

Prime Minister Naoto Kan had asked Chubu Electric Power Company to shut down their Hamaoka nuke plant, because it turns out that it is right over a convergence of fault lines, and scientists expect a magnitude 8+ quake.

Hamaoka is south west of Tokyo. Kan wants CEPCo to shut down the plant, and reinforce the reactors to withstand an 8+ quake.

CEPCo officials studied several options, including how to pay for the cost of reinforcing their nuclear plant.  They decided they don’t have the money to reinforce the plant, and it would not be feasible to raise electric rates high enough to pay for it (because customers would refuse to pay the higher rates).

CEPCo also decided that shutting down the plant would make the already bad situation, for Japanese industries dealing with lack of power, even worse.

CEPCo is not ruling out shutting down the Hamaoka plant, if they can do it with out reducing electrical power, and find money to pay for the reinforcing.

False Flag op? Japanese scientists knew major tsunami was going to hit Japan, at least one month prior!

A report discovered by Japan’s NHK news, shows that officials knew in February that a major tsunami could hit Japan soon.

The report was put together by the Earthquake Research Committee.  It looked at geographical evidence, and recent studies, and came up with a scenario that is exactly like what happened on 11 March.  It even named Miyagi and Fukushima Prefectures as being the hardest hit!

The conclusion of the report was that the prefectures of north east Honshu needed to make preparations.  Even though the report was finish in February, the officials weren’t planning on releasing it until April.   Apparently even the experts didn’t think it could actually happen.

TEPCo: problems with another Japan nuke plant

Tokyo Electric Power Company announced early May 2, that another of their nuclear plants in Japan is in trouble.  The Tsuruga nuclear plant is having technical problems, resulting in overheating.

The plant is around 450 km (280 miles) west of Tokyo, in Fukui prefecture.  TEPCo says the problem is so bad they are considering shutting down the whole plant.  There is a possible leak of iodine from Tsuruga nuclear plant #2 reactor’s nuclear fuel assemblies into its coolant.

School 50km from Nuke Plant must remove top soil!

The city of Koriyama is 50km (31 miles) away from Fukushima Daiichi, well out of the evac zones, yet the soil at their schools are so contaminated they have get rid it.

Starting this weekend, they will remove the top 2 centimeters (.78 inches) of soil from 28 schools.  Even after the soil removal, school officials say they will not allow the children to play in the yards for more than one hour per day.

 

 

 

Female TEPCo employee contaminated 3 times safe limit!

A female employee, working at the Fukushima Daiichi nuke plant, is contaminated with three times the safe limits for women.  She was working at the damaged plant, directing emergency crews.

Tokyo Electric Power Company thinks she was contaminated when taking off the protective suit.  They say most of her contamination is internal, so they think she inhaled the radiation. TEPCo is now testing all female employees at the nuke plant.  Safe exposure limits for women are set lower than men.